As not all risks are equal, there has to be made some differentiation in treating them in the prevention and management phase.
Go through the list of identified
risks and prioritise them
against their likelihood of
occurring and magnitude of
negative impact on the projects
by using the matrix below
(worksheet 2 of handout 7.3).
Assign priority levels between
1-5 to the risks as shown in the
matrix.