• The National Solar Mission was launched on the 11th January, 2010.
• The Mission has set the ambitious target of deploying 20,000 MW of grid connected solar power by 2022 and aims at reducing the cost of solar power generation in the country through.

  • Long term policy
  • Large scale deployment goals
  • Aggressive R&D
  • Domestic production of critical raw materials, components and products